Blackburn 

The Blackburn tower and  mini pop are now fully operational.

AirwaveMini7.png

Moffetts Corner/Masham/Big Bend

We have added a new 2.4 Ghz access point to cover the north area of Moffetts Corner and added another 900 Mhz to add additional capacity to the west.  We have upgraded the 5 Ghz access point to provide higher power and additional capacity and higher speeds.  We plan on testing AX gear at Moffetts in the next 90 days and adding a redundant backhaul link.

Ralston905.jpg

Skedee

Skedee mini pop installation is complete and now fully operational.  We will be adding a redundant backhaul link between Fairfax and Skedee as well as upgrading  the backhaul link to Maramec.  We will also be testing a potential backhaul link between Skedee and Grey Horse to provide redundant routing.

AirwaveMini8.png

Upcoming

Deployment of the next generation wireless gear is in progress 6Ghz AX has been deployed in Fairfax and we will be upgrading customers to the new equipment over the next 30 days providing speeds up to 100 meg.

SkedeeMini6.png

Maramec

We will be upgrading the access points at Maramec with higher capacity equipment and higher gain antennas over the next 30 days.

DSC00362.jpg

Ralston South

Ralsont south has been upgraded with 60 ghz and 5ghz AX gear, allowing speeds up to 100 Mbps. We have also added redundant paths for the KAMO fiber feed at Ralston South 

DSC00397b.jpg

Upgrades

Ralston AX access points have been installed in Ralston and on the Hill Top tower and customers are being converted to the new equipment.  allowing speeds up to 100 meg in most areas.  We now have dual fiber feeds for redundancy and additional capacity.  The backhaul between Ralston and Fairfax, Fairfax and Grey Horse, Ralston to Ralston Mini, and Ralston to Ralston South have all been upgraded. 

Ralston Equipment.png

New Locations

We have begun the process to turn up towers to serve Pawnee South and Hallett.  We have identified tower location for both locations.  Pawnee South tower placement is scheduled for 1/31/25 and should be lit an ready for traffic by 2/4/25.  Hallet site survey is scheduled for the week of 2/3/25.